中框卡槽带锁扣 模具 ABS 黑色 一出六穴
- Home
- molds
- plastic mold
- 中框卡槽带锁扣 模具 ABS 黑色 一出六穴
¥¥2.00 ¥¥1.00
产品内容:中框卡槽带锁扣 规格:164.49*308.76*32.13mm;482.856 KG 产品材质及颜色:ABS ,黑色,一出六穴位,表面光面; 最小起订量:2000PCS,交货时间为 10 天; 开模周期:30天; 模具材料:模芯S136热处理硬化,模架LMK45钢; 保修:在我公司塑料生产期间,模具免费保管、保养、保修,免费改模(除大动作结构更改); 对于非我公司生产的模具,将收取适当成本费用。
- Information required for quotation
Products:
1. Graphics (please provide 3D graphics, ignore if provided)
2. Material (whether there are other requirements, such as high-gloss material, V0 fireproof material)
3. Colors
4. Appearance (e.g., smooth surfaces, fire patterns, fine lines, etc.)
5. Estimated order quantity of products (monthly production)
6. Product packaging and delivery requirementsMolds:
1. Molding point (low unit price for porous products, but slightly higher mold price)
2. Mold material requirementsQuote customer information:
1. Company name, contact person and contact number - Molding and Plastic Production Processes
Products:
1. Graphics (please provide 3D graphics, ignore if provided)
2. Material (whether there are other requirements, such as high-gloss material, V0 fireproof material)
3. Colors
4. Appearance (e.g., smooth surfaces, fire patterns, fine lines, etc.)
5. Estimated order quantity of products (monthly production)
6. Product packaging and delivery requirementsMolds:
1. Molding point (low unit price for porous products, but slightly higher mold price)
2. Mold material requirementsQuote customer information:
1. Company name, contact person and contact number - Cycle time and transportation
Sample mold opening cycle: 5-15 days (according to the product structure cycle varies)
Mass production plastic molding cycle: 20-45 days (according to the product structure cycle varies)
Hardware mold opening cycle: 7-25 days (according to the product structure cycle varies)
Injection molding production cycle: 3-10 days (depending on the product structure cycle varies)
Cycle time for oil spraying, screen printing, laser engraving and other surface processing: 2-10 days (according to the size of the order cycle varies)
Shipping cycle: plastic products next day to the Pearl River Delta, other regions 2-3 days, metal products need to contact customer service.
- payment method
Mould: prepaid deposit 50%, full payment one week after the product is confirmed ok;
Products and payment: cash settlement, monthly settlement
Need to contact customer service or message for quotation
- Comments
- Related Products